August 22, 2016
Our North Oak location construction is coming along. All the roof trusses are up and the rest of the roof sheeting will be installed this week. The shingles should be installed this week as well. All the rough grade between the parking lot and the roads is complete. The sprinklers and landscaping should be started sometime this week. We had our final meeting with the cabinet guy as far as the layout and type of cabinets that will be throughout the bank last week. This week we are doing a walk through to figure out electrical and final branch layout. We hope to be open for business in November 2016.